Is the size of the air discharge line sufficient to eliminate moisture and contamination build-up within the wet tank?
A. Yes. The entire contents of the wet tank are drawn out and expelled due to the air pressure within this tank. Extensive testing has determined that a larger diameter opening and line size would not appreciably facilitate the elimination of contamination any faster than it is currently being expelled.
Related Questions
- Where should the discharge line be located when installing the ClearDrain System to the Wet Tank (always the first air tank after the compressor)?
- Is the size of the air discharge line sufficient to eliminate moisture and contamination build-up within the wet tank?
- What can be done to reduce the amount of moisture or water in the air supply line for a Sky Climber® air motor?