Is the Partnership studying a tunnel for a new crossing?
All reasonable options will be considered during the EA/EIS Study. The new crossing may be a bridge or a tunnel. Alternative solutions will be evaluated, and mitigation will be developed, using a wide range of factors and indicators, which will represent natural, social, cultural, economic and engineering factors. The decision as to whether a new/expanded crossing will be a bridge or a tunnel will be made in the next stage of the study.