Is the network design approved by the vendor?
Related Questions
- When are signed and approved plans (by the design engineer and/or city engineer) required to be submitted during the permit process?
- How can we get funding for the site selection process before the Site and Design Prospectus has been approved?
- What is the methodology to get listed on the "approved" design firm list?