Is surveying for the entire pipeline route finished? Has the exact route been established?
Nord Stream has finished all survey operations. At last, the anchor corridor survey, which started on 15 November 2008, was finished in September 2009 after 54 weeks of continuous operations involving 11 vessels. All the data necessary to establish a safe pipeline route has been gathered. The installation permit application accounts for the possibility that the pipeline route may need to be adjusted slightly in order to ensure a safe distance from sites with objects such as sensitive wrecks. Such cases are to be discussed individually with the responsible national authorities.