Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Is Elevation 4.4196 of the existing deck based on Mean Sea Level or Mean Lower Low Water?

0
Posted

Is Elevation 4.4196 of the existing deck based on Mean Sea Level or Mean Lower Low Water?

0

No. The elevation is based on the benchmark shown on the foundation plans. 102. Will the double T or bulb T support highway loads through the stems before the CIP deck is poured? See sheets 222 of 347 and 247 of 347 for the construction equipment loading. 103. On plan sheet 162 of 347, should there be a Bent 343A, shown for alternate 2? See plan sheet 158 of 347. 104. On plan sheet 232 of 347, “Typical Section ” for the double T-girder shows a depth D=826. On the same page the table shows a depth D=813 for all possible options. Please clarify. See addendum #1. 105. Is the concrete fill in the pile void of the precast cap paid for as piling, erect precast concrete cap or as structural concrete bridge? Is the cast-in-place concrete that completes the precast cap, i.e., page 216 of 347, Section B-B or E-E, paid for as structural concrete or precast cap. On plans sheet 138, the section “Concrete Strength and Type Limits” seems to tell us that some cast-in-place concrete is paid for as prec

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123