Is code approval required?
No. Fastfoot is a temporary form, similar to lumber. • How deep a footing can I pour? Footing depths up to 24″ are achieved with Fastfoot. If the height of the fabric under the 2×4 screed rail is greater than 10″, install a second 2×4 to reduce fabric tension and bulge (the 10″ rule). See the installation manual for more information. • Will Fastfoot reduce my costs? In most cases Fastfoot will reduce your forming costs significantly. Increased footing depth will lead to increased savings. Conversely, a higher reuse of your forming lumber will reduce your savings. For a detailed cost comparison using your project specifications, please click here. • Will Fastfoot improve my forming speed? Yes. You no longer transport 2x10s or 2x12s to and from the jobsite. Stripping of 2x4s and stakes is fast as they haven’t touched concrete. Concrete placement is fast as you use a higher slump concrete without leakage. • Can I vibrate the concrete? Yes, or kick the fabric. • How does the fabric affect