Is Capillary Piping system installed in USA?
Do you provide the sub-stations? Yes. We will provide the sub-stations which consist of pump, valves, expansion tank, heat exchanger, piping and all associated controls based on the load and zone distribution requirements. Do you provide engineering services? Yes. We have in-house engineering personal and we can provide design, drafting and an energy study for radiant cooling and radiant heating. We will need architectural drawings in order to provide estimate for our services. Do you provide estimating services? Yes, we will provide cost estimate for our product. Any additional service required will be provided based on customer requirements.. Is there a problem with corrosion or oxidation? None. Pipes and fittings are made out of polypropylene (plastic). Also heating water is at a low temperature (around 103 F for heating and 62 F for cooling), so corrosion and oxidation does not take place. How quick is the capillary tube ceiling reacting? Capillary System is fast reacting. After ju