Is CAPE able to solve cases for Power Plant Generation Auxiliary Systems and Medium and Low Voltage Systems?
Yes. For example, we recently built a network for a customer who is modeling part of a very large coal-fired power plant; it goes down to around 400V from 110 kV. In this case, we used a double-bus with a spare bus/breaker for part of the model. This particular plant model was added to a 3,500-bus system model in such a way that the user can switch in the detailed plant model or revert to the original simplified model any time.