Is an existing solar project which is currently registered under NJs SREC Registration Program and BPU inspected eligible for this SREC RFP?
It cannot be determined whether the project might be eligible based on such information. The following are a few notes regarding eligibility for the ACE and JCP&L SREC-Based Financing Program: • a project must have completed the Initial Application process under the Renewable Energy Incentive Program (“REIP”) or the SREC Registration Program administered by the Board of Public Utilities; • a project must not yet be interconnected and the Proponent must not request interconnection prior to the Board Order on the results of the solicitation. Existing projects that are interconnected are not eligible; • projects that received or will receive a rebate from the Customer On-Site Renewable Energy (“CORE”) Program in force from 2001 to 2008 are not eligible to present a Proposal under this RFP; • projects less than or equal to 500 kW are eligible to submit a Proposal, and the size of a Project is based on the nameplate DC rating of the solar system; • for a Project to be eligible, it must be l
Related Questions
- Ive already registered for Dreamforce. How can I add a hotel reservation to my registration or make changes to my existing hotel reservation?
- How long will it take to receive an acceptance letter for my solar project once the NJCEP receives my SRP registration package?
- Whether existing registered dealers would require to seek fresh registration?