Is an at-grade alternative being considered only because funding is limited?
A. No. Light rail systems are typically operated at-grade. An at-grade alternative for this corridor has been considered as far back as the mid-1980’s and has been included in all of the studies done since that time. East-West Gateway staff and consultants are continuing to consider other, more costly alternatives, as well as an at-grade alternative.