Is all new construction required to be located outside of the 150 foot setback?
• All new construction, development and earthmoving must be located no closer than 150-feet from the River Area, except as provided below: • Elevated patios, decks and walkways; • Caged or non-caged swimming pools; • Gazebos up to 400 square feet in floor area; • Water dependent structures such as boat docks and piers; and • All structures more than 2,200-feet from the bank of the main stem of the Myakka River. *Note: FAQs are for informational purposes only. They do not guarantee nor imply that authorization for construction, excavation or vegetation removal in the MRPZ will be granted or are exempt. Site specific conditions will be considered for all requests.