Is a NYSDEC or US Army Corps of Engineers permit required?
The Town Board shall be responsible for any final determinations related to appeals form residents. The Town Board may involve an advisory committee for input on certain drainage issues. If the Town of Penfield determines it is appropriate to complete site-specific drainage improvements, the following conditions must be agreed to by the affected property owner(s): • Property owners grant permission for property access to contractors/town staff • A drainage easement is granted to the Town of Penfield for piping and structures • The property owner shall be responsible to replace or relocate any landscaping or structures disturbed by the work. These shall not be installed within the easement.