Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Is a loading dock available for subcontractor material delivery?

0
Posted

Is a loading dock available for subcontractor material delivery?

0

There is a loading dock on the first level of the Temporary Central Library space, accessible from the alley. In addition, the general contractor could temporarily modify the double height atrium space to accommodate material delivery and handling. • Are the Washington State Convention and Trade Center elevator(s) available for Temporary Central Library use? The service freight elevator may or may not be installed in time for the general contractor for the Temporary Central Library to use it. If the elevator is operable, the general contractor for the Temporary Central Library may arrange to use it. • Will Kiewit need to be named as an additional insured by the general contractor for the Temporary Central Library? It is likely, however currently undefined. We will define this as part of the bid. • Will permanent power be available? Assume that temporary power will be required. The electrical transformer is being installed, but we will confirm power availability for the project for the

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123