If the verifier is no longer checking the design, is there a requirement to submit drawings with a building warrant application?
Yes, drawings need to be submitted as they were under the previous system. This is to enable Building Control to check on construction and also acts as a record of the construction/approved warrant. It is advisable to refer to the BSD Procedural Handbook (available on the BSD website www.sbsa.gov.uk) which is essential reading for all those who wish to become registered.