If the test production month is counted in the department of Alberta computer system as a production month, what should the client do?
If the well meets eligibility criteria, the Department of Energy would count the test production as a production month. The client would be required to make an application and the department would remove that production month from the allowed 12 production months if the data is found to support the test criteria (120 hours). Application (letter) has to be sent to Director Gas Royalty Calculation.