If data are being developed on a VCCEP chemical for another program with an established schedule, will EPA adjust the time allowed to conduct and prepare final reports for the VCCEP?
When other programs have required testing that overlaps with the tests to be conducted in the VCCEP, EPA will be flexible where possible concerning data submission dates so that the needs of other programs can be accommodated and duplication of testing can be avoided. Specific situations should be brought to EPA’s attention in writing , citing the due dates for other programs as the basis for proposed submission dates for the VCCEP program. These letters should be sent to: Ward Penberthy, USEPA, 1200 Pennsylvania Ave., NW, Mail Code 7405M, Washington DC, 20460.
Related Questions
- If data are being developed on a VCCEP chemical for another program with an established schedule, will EPA adjust the time allowed to conduct and prepare final reports for the VCCEP?
- Do "independent contractors: or part time crewmembers need to be part of a marine employer’s chemical testing program?
- How much lead time is required to schedule a program?