I need to get a final inspection and an architectural review. Who does that?
An application, in general, receives Concept, Preliminary, and Final Details reviews of the plan prior to issuance of a building permit. Final inspections take place after the project is built. Both the Building and Safety Division and the Planning Division conduct final inspections to be sure the requirements have been fully satisfied. Contact each division to schedule your final inspections.