I have programmed a cooling rate of 400 degrees F per hour, which should take 4 hours to cool down to 100 degrees F. Why is the kiln taking 7 hours to cool instead of 4 hours?
Related Questions
- Must the insulin rate remain unchanged for four hours and able to go to every two hour BG-checks before going to the floor?
- I have programmed a flash cool in the Sentry 2.0 controller with a rate of 9999. Why does the FTC message keep coming on?
- If you e letting water cool, does the rate of cooling decrease when the surface area increases?