How would this work for a new industrial facility, for example a gravel pit?
For a new gravel pit, the fees would be applied to the structures and road impacts for the opening of the pit. The fees on the gravel hauled from the pit would be captured with each new project, paid by the project developers, not by the gravel pit or the individual truckers. Also, materials hauled for projects not requiring development permits would not be subject to the fee, such as graveling the road to an existing house.