Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How will the Swimming pool be built and how quickly?

0
Posted

How will the Swimming pool be built and how quickly?

0

The simple answer is your pool will be completed in around three to four weeks and after agreeing the final location and what to do with the spoil we undertake all the technical and building aspects. Leaving you to go shopping for a new swimming costume. The longer answer for those intrigued by the more technical aspects: Your pool will be built using Polypool patented interlocking panels, where each panel locks to the next with key locks. The panels are manufactured by Polypool in its UK factory using CFC free rigid polyurethane insulation foam injected between two facing sheets in pre-set jigs. The foam injection process is undertaking in large hydraulic presses to ensure dimensional stability and insulation density requirements. Overall average panel foam density of 40/kg/m3 gives the following ‘u’ value. 125mm panel 0.084 watts / m2 Kelvin. All panels have an integrally formed compressible closed cell sealing system. Your pool will be marked out and then carefully excavated to redu

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123