How will the public be involved during the Bridge Type Selection Process?
The bridge design team will work closely with stakeholder groups and the Citizen Advisory Committee to determine which types of bridges should be included in the final alternatives. Public feedback will be gathered at numerous open houses held throughout the process where electronic polling and comment forms will be used. Public feedback will be utilized to develop bridge types that are consistent with the communities’ character and location. • What are the steps in the Bridge Type Selection Process? The Bridge Type Selection Process consists of four essential steps: the development of design guidelines, the development of bridge concepts, the development of bridge alternatives, and the selection of final bridge types for both bridge locations. Stakeholder and public feedback will be sought for both bridge types during each step of the Bridge Type Selection Process. • Will the same design process be followed for each bridge? Both bridges will followed the same process, from the develop