How will the greenhouse be assembled on Devon Island?
The greenhouse was test assembled inside the large dirigible hangar at NASA Ames Research Center in April 2002. It was then disassembled and put in storage along with the materials required for its support structure. The greenhouse was delivered to Devon Island in early July and was assembled by SpaceRef and HMP personnel during the second and third weeks of July.