How will stormwater management of the roadway be addressed?
This project will create new impervious pavement and sidewalk areas, therefore mandating the control of stormwater coming from these locations. A significant portion of the roadway drainage will be conveyed to either the existing pond(s), maintained by the Peterson Companies on the east side of the Parkway, or to a new VDOT pond to be located in the northwest quadrant of the Fair Lakes intersection/interchange. VDOT is currently analyzing the feasibility of using the existing ponds and is in discussion with the Peterson Companies on a potential agreement. If you have additional questions, please contact: Fairfax Preliminary Engineering Virginia Department of Transportation Northern Virginia District 14685 Avion Parkway Chantilly, VA 20151-1104 meeting_comments@virginiadot.org. Please include: “Fair Lakes Parkway Interchange @ Public Hearing Comments” in the subject line, or print and mail the the comment sheet.