How will general restoration be handled (grass, paving, etc.)?
The wastewater contractor will loam and seed all vegetated areas disturbed during construction and will provide trench width asphalt patch for areas of bituminous driveways disturbed by their construction activities. If you removed non-readily removable items to clear a path for the wastewater contractor, you will be responsible for replacing the non-readily removable items once the connection to the wastewater system is made. The wastewater contractor will not be responsible for replacing any non-readily removable items.