How to pour a cement floor finish?
How to finish a cement floor? Paul:. Regardless of the type of finish, i. , paint, stain, sealer, or decorative coating, the most important step, and the one to which considerable time should be given, is surface preparation. More often than not, a consumer doing a project at home will simply clean a given floor and apply one of the finishes referenced above. After 2 to 3 months, and sometimes as little as 2 to 3 weeks, the paint, stain, sealer begins to “fail. ” Most product will not adhere to concrete that has not been properly prepared prior to application. To properly prepare concrete that has never been sealed or painted, an acid wash is necessary. This is a cumbersome process, but time well spent to ensure that the coating adheres to the floor. For extremely smooth concrete, we recommend mixing one part muriatic acid to 3 parts water. Always add acid to water and NOT acid water to acid. Apply to floor and scrub in with a stiff broom. Allow acid to foam and fizz for approximately