How should the sub floor be prepared?
The sub floor should be prepared as for any conventional tile installation in accordance with all applicable standards. It should be clean of all debris and sharp edges/objects that might damage the element. Loose boards should be repaired and all gaps should be filled to assure that the mat is installed over a smooth and even surface.