Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How should the rental boiler be prepared for shipment after it is no longer needed by the user?

0
Posted

How should the rental boiler be prepared for shipment after it is no longer needed by the user?

0

The boiler should be opened, washed out/drained completely, and inspected by the boiler inspector. An inspection report (found in the boiler’s instruction book) should be completed and forwarded to Nationwide Boiler.

0

The boiler should be fully-drained, opened, washed-out, and inspected by the boiler inspector and plant personnel. In our mobile boiler rooms, the feed system, water softener, and chemical treatment equipment should also be fully-drained prior to shipment. The Inspection Report found in the front of the Instruction & Operation Manual should be completed and forwarded to Nationwide Boiler Inc. at the completion of the rental project. This work is the responsibility of the Lessee.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123