How should I handle bulk waste from a facility that contained RACM and that was not found until after demolition began?
The demolition debris must be treated as asbestos-containing waste. Adequately wet the demolition debris until collected for disposal and during loading, transport it in covered vehicles and emit no visible emissions to the outside air as required by 61.150 of asbestos NESHAP. The waste must be deposited at an acceptable waste disposal site.