How quickly can Architectural Testing begin testing for my product?
Testing can typically be scheduled within 2 to 3 weeks of ATI receiving authorization and the samples. Final reports will be sent within 2 weeks of our receipt of all required information, including product drawings as necessary. A draft report may be available prior to the 2 weeks on a case by case basis.