How often is concrete poured accurate enough to merit not using a mortar bed? Or should it be standard practice to use a mortar bed?
Most installers will finish the concrete very flat and then bolt the jib crane column directly to the foundation. Our jib columns generally are very square because they are welded on a rotating semi-robotic jig. However, no weldment is perfect. The use of a mortar bed to correct any imperfections in the finish of the foundation or to plumb the jib crane column is perfectly acceptable.