How much would it cost to re-open the Alto Tunnel and make it a part of the North-South Greenway?
Cost estimates in the final draft of the Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study range from $40 to $50 million but contain several sets of contingencies that range from 15% to 20%. We believe that these estimates will be reduced substantially when engineers have an opportunity to get inside the Alto Tunnel and evaluate the tunnel’s condition.