How much traffic can unpaved roads treated with stabilization products handle?
The amount of traffic one of these roads can handle depends on the product being used, the method of application, the application rate, and the type of soil being treated. The preparation of the road prior to application of product is also extremely important. Some of the mining haul roads that we treat have 200 ton haul trucks running on them 24/7. We treat these roads with Dust-Off (magnesium chloride) once with a heavy application and then we will perhaps apply a light maintenance application. The maintenance applications will vary depending on the type of traffic, the configuration of the haul road, and the type of material used to build the haul road.
Related Questions
- Most of the traffic congestion in Columbia is on Missouri Department of Transportation (MoDOT) roads. Are there any plans to address these problems?
- Does railroad property owned by a railroad company or railroad property containing a right of way get treated in the same manner as roads?
- Do Miracore treated unpaved roads really last?