How much time does the cross-linking reaction take?
The cross-linking bond begins forming over a period of time ranging from hours to days and bond strength builds proportionately. But, keep in mind the initial bond has enough strength to allow assemblies to be machined or finished immediately after bonding and the adhesive has set. Load bearing joints should not be stressed for 24 – 48 hours, so that the cross-linking reaction can occur.