How much time does it take to prepare a simulation?
If the materials and the electrode forms are available in the databases, it takes less than 10 minutes to prepare a new simulation for spot welding. If the technical drawing of a special electrode is available, it takes a few minutes to add the electrode design into the database. It may take some more time for preparing complicated projection welding simulations depending on the complexity of the geometry of parts, but usually it takes less than an hour.