How much information is needed to complete a TIA report?
• Executive Summary, Introduction (study purpose, objectives, site description and study methodology), Existing conditions in the area of the development, Recorded or approved nearby development, • Existing traffic volumes, an assessment of the change in roadway operating conditions resulting from the development traffic, and • Recommendations for site access and transportation improvements needed to maintain traffic flow to, from, within, and past the site at the City’s minimum acceptable level-of-service requirement. Note: Prior to preparation of a Traffic Impact Analysis report, the developer with a project engineer is encouraged to meet with the City Traffic Engineer to identify the study area, define the area of influence, and non-site traffic impacts. 44.) Who should prepare a Traffic Impact Analysis? A Traffic Impact Analysis (TIA) report should be prepared under the supervision of a qualified and experienced registered professional engineer who has specific training in traffic