How much faster can I build with New Discovery Bricks?
Homes go up faster than traditionally framed buildings and concrete buildings. A trained installation crew can put up a complete house (including finishing’s) in as little as eight weeks. Bricks are manufactured in standard sizes and arrive on site as a complete package. The shipment contains all the necessary building components eliminating the time needed to perform individual jobsite operations of framing, insulating and sheathing stick-framed walls. Openings are already planned for and are incorporated into the build as progression is made. Electrical chases are created after the walls are up and made by removing a strip of the top OSB layer.