How much cheaper would RapidBART be to build, compared to OAC?
A lot. OAC would cost $550 million while RapidBART is projected to cost $45-$60 million. That’s a savings of $500 million! What could be done with the savings? The $70 million of stimulus funds would be reallocated back to the transit agencies, including BART, which would receive $15 million that could be used to halt some of their service cuts and/or fare increases. (AC Transit, Muni, and other agencies could do the same with their shares.) Other funds could be used to subsidize fares so that the system would be free: In particular, TransForm is recommending that BART request the Metropolitan Transportation Commission to shift the $65 million of Regional Measure 2 funds designated for the Oakland Airport Connector into an annual operating revenue source. If additional funds are needed then some of OAC’s Regional Measure 1 funds could be used. Another source could be the Port of Oakland’s proposed contribution, which could be used as an endowment in an interest-bearing account that thr