How much asbestos must be present before the Asbestos NESHAP work practice standards apply to roofing projects?
When a rotating blade (RB) roof cutter or equipment that similarly damages the roofing material is used to remove Category I non-friable asbestos-containing roofing material, the removal of 5580 ft2 or more of asbestos-containing roofing material will create at least 160 ft2 of RACM and is subject to the NESHAP. If the removed material is less than 5580 ft2 then the removal is not subject to the NESHAP, except that notification is always required for demolitions. When the removal of Category II non-friable asbestos-containing roofing material is at least 160 ft2 and the removal methods will crumble, pulverize, reduce to powder, or contaminate with other RACM, the removal is subject to the NESHAP. When the total asbestos-containing roof area undergoing renovation is less than 160 ft2, the NESHAP does not apply, regardless of the removal method to be used, the type of material (Category I or II), or its condition (friable versus non-friable), except that notification is always required f
Related Questions
- How much asbestos must be present before the Asbestos NESHAP work practice standards apply to demolition projects?
- How much asbestos must be present before the Asbestos NESHAP work practice standards apply to renovation projects?
- How much asbestos must be present before the Asbestos NESHAP work practice standards apply to roofing projects?