How many tracks can be built in the railroad right-of-way?
There is generally enough room along almost all the FEC alignment for at least four sets of trackstwo for passenger rail and two for freight if necessary. How many are actually built will be decided during Phase 2 of the study when certain corridor segments are examined more closely. The question of whether the preferred alignment will include rail at all will be determined as the Alternatives Analysis process advances to the Locally Preferred Alternative (LPA).