How many tracks are needed for the new line? Will more be built?
The conceptual plans developed during the Alternatives Analysis call for two tracks for light rail service along the full length of the alignment from Glassboro to Camden. Two new tracks may be built along the length of the line, or one new track may be built and the GCL would share the single freight track for a portion of the line.