How many people can work on a construction site at a given time?
The optimal number of site volunteers depends on the site and the work plan for the day. Typically, the maximum number of volunteers is 10-20 per day. We want to ensure that there is enough room for people to physically operate. Supervision can be difficult when there are too many people, resulting in people standing around doing nothing.