How long would the turbines stay and what would happen at the decommissioning stage?
The wind farm would be built with specifications for a 25-year lifetime. At the end of their working life the wind turbines would be removed and the ground surface would be reinstated to its former condition to allow the site to revert to its former agricultural use. Through the whole decommissioning process the will be continual consultation with the landowners.