How long will the templating and installation take?
Please allow for at least an hour for templating. You should be there for a short period of time in case we have any questions. If you have contracted us to remove your existing countertops, assume additional time might be needed. Installation usually takes anywhere from three hours to a day for an average kitchen, depending on complexity. If you have a plumber scheduled to reconnect your plumbing the same day, please be sure to schedule them as late in the day as possible or the following morning.