How long will the drilling take? What times will the drilling take place?
From the time the pad preparation begins on a single-well site, the entire process of setting up the rig, drilling, fracture stimulating (fracing) and installing operational equipment usually takes six to seven weeks. During the approximately three weeks of drilling, operations run continuously 24/7. The fracing may take three to four days and is restricted to daylight hours.