How long should it take to replace the pavement markings?
All complaints are inspected with 10 working days, if the complaint is warranted a pavement marking plan is generated and the work will be done once our annual pavement marking contract is in place. The construction season for pavement marking is from April through November as long as the outside temperature stays above 45 degrees. Depending on when the request is made and if a contract is available the process can take between 4 to 6 months.