How long should it take to do a 9 foot AVON?
Like anything else it depends on a number of factors. Proper preparation is critical for any coating and SRC is no different. The boat needs to be clean and free from any contaminants (like oil or Armorall) I recommend rubbing down the surface with a 3m pad prior to application of the basecoat. Once the boat has been prepped application of basecoat should take about two hours. The basecoat needs to dry thoroughly before applying topcoat. There should be no strong chemical (xylene venting) smell when topcoat is applied. Again a couple of hours should do it.