Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How long should I wait after pouring a new concrete floor before applying Smiths Color Floor?

0
Posted

How long should I wait after pouring a new concrete floor before applying Smiths Color Floor?

0

Smiths Color Floor can be applied to uncured concrete. Smiths Color Floor allows the transfer of moisture; however, a problem arises when applying a clear sealer. These tend to be higher in vehicle solids, thus trapping moisture in the uncured concrete surface. This trapped moisture will result in a failure or the pealing of the sealer. A standard cure is approximately 30 days for a concrete slab. The cure time depends on temperature, humidity, airflow and thickness of concrete. Can the surface be wet when I apply Smiths Color Floor? As long as standing water does not exist, you are ready to apply Smiths Color Floor. Note, this will increase cure time. Is there a test I can use to make sure that Smiths Color Floor will adhere to my surface? Smiths Color Floor has very good adhesion. This can cause problems, due to the fact the stains will adhere to dirt, grease and other foreign materials. The problem or failure arises with ho to cold temperature shift as well as foot traffic or wear o

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123