Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How long should a floor acclimatize?

acclimatize floor
0
Posted

How long should a floor acclimatize?

0

Length of time for acclimatization is not the important issue, but rather moisture content. A contractor who is installing flooring should have a moisture meter and the flooring and the subfloor should have a moisture content between 6-10%. This is to ensure that the wood does not shrink after installation and leave gaps between the floor boards as wood is constantly expanding and contracting with changes in moisture content. Acclimatization could be a week in a dry home in the winter with dry wood or months in a home with no dehumidifier or air conditioning in our Winnipeg summers.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123