How long is a signed wetland survey good for?
It is good for 5 years after being signed by the Army Corps of Engineers. 3) How are wetlands determined? They are determined by using the guidelines in the 1987 Army Corps of Engineers wetlands manual. These guidelines include the three parameter approach using soils, hydrology, and plants. 4) What activities require a CAMA Major Permit? In general, any development activity that takes place within an area of environmental concern (AEC) that also requires another separate state or federal authorization. Examples of typical projects requiring CAMA Major Permits include marinas, water front developmnet, new dredging and beach nourishment. 5) What activities reviewed by the Division of Coastal Management require the preparation of an Environmental Assessment (EA) or an Environmental Impact Statement (EIS)? In general, an environmental document is required for new marinas, new navigation channels, excavation of material from an aquatic environment for beach nourishment or other purposes no