How long does the complete design process take?
Depending on the scope of your project, the time it takes to plan, design and create your new Think Space can take anywhere from 6 weeks to 6 months to complete. If you are rearranging existing office furniture, installing new flooring and replacing existing wall coverings this can be done in about 6 weeks, again depending on the size of your project. If your project includes a complete office design remodel including a new ceiling, new lighting, and new office furniture or refurbished office furniture the process can take anywhere from 2-6 months, and possibly longer. If you are moving you should allow at least 4-6 months to plan. Think Spaces will provide a timeline specific to your situation.